The last couple of weeks since closing have been CRAZY to say the least. We gutted the kitchen and bathroom, front wall, raked over 50 contractor bags of leaves, sawed trees down and put gutters up. There have definitely been some hang ups along the way like 4 inches of concrete poured on the bathroom floor encasing the pipes that we had to chisel away or the fact that we need a permit to convert the boiler from oil to gas. It is an amazing feeling knowing so much is getting done. I would like to give a special thanks to Frank's dad and my brother Kyle. They worked tirelessly, even when me and Frank had to go back to work. My brother is a work horse and "Big Frank" as he calls him really took him under his wing and taught him a few things.It has been a ton of fun.